Changes

Jump to navigation Jump to search
39 bytes added ,  00:26, 20 September 2014
m
Line 89: Line 89:       −
= SME 9.0 RC 1 = Done 5th October
+
= SME 9.0 RC 1 - Done 5th October =
 
* Maturity matches SME 8.0
 
* Maturity matches SME 8.0
 
* Extensive testing need to prove maturity
 
* Extensive testing need to prove maturity
 +
 +
'''Status:''' Achieved, October 5th
    
= SME 9.0 Final =
 
= SME 9.0 Final =

Navigation menu