Changes

Jump to navigation Jump to search
17 bytes added ,  04:30, 3 March 2013
no edit summary
Line 39: Line 39:       −
= SME 9.0 Alpha 2 =
+
= SME 9.0 Alpha 2 - Done 2nd March =
 
This is the second ISO created from the SME 9 stream.
 
This is the second ISO created from the SME 9 stream.
  

Navigation menu