Changes

Jump to navigation Jump to search
325 bytes added ,  17:03, 4 February 2013
no edit summary
Line 44: Line 44:  
= SME 9.0 Beta 1 =
 
= SME 9.0 Beta 1 =
 
* Maturity is sufficient for widespread testing use
 
* Maturity is sufficient for widespread testing use
 +
* contrib owners should start testing their own contrib packages
    +
= SME 9.0 Beta Y =
 +
At some point in the Beta cycle, as maturity improves and the rate of change slows, contribs should be tested.
 +
 +
= SME 9.0 Beta X =
 +
As many Betas as needed to make it mature.
    
= SME 9.0 RC 1 =
 
= SME 9.0 RC 1 =
Line 55: Line 61:  
* Feature parity with SME 8.0, the intention is not to add new features
 
* Feature parity with SME 8.0, the intention is not to add new features
 
* Content identical to the final RC, just version and release note updates.
 
* Content identical to the final RC, just version and release note updates.
 
+
* The main contrib packages should be working at the final release.
       
[[Category:SME9-Development]]
 
[[Category:SME9-Development]]

Navigation menu