SME9.0 Roadmap
Back to SME Server 9.0 Development
Work in progess
This page will be updated with the plan to 'SME 9.0 FINAL'. In addition to the roadmap there needs to be a short-term task list for community members. That will be linked from here.
Pre-Alpha
Development is performed using COS6 minimal and packages from SME 8 and any other needed repo.
checkpoints
No external yum repo
COS6 ISO is used as a base, but only SME repos are needed.
status: Achieved 5th Feb 2013
SME Server Services start
- SME Server 9.0 will use runlevel 4
- Use Upstart
- Ensure that the services start
Create SME 9 packages
- Build all SME Server packages on COS6, see SME9BuildQueue
- Cleanup SME 9 packages
- Import package into SME9
SME 9.0 Alpha 1 - Done 14th Feb
This is the first ISO created from the SME 9 stream.
Status: Achieved, 14th February
Goal
- Our own ISO to replace need for COS6 minimial ISO.
- Base to start verifications
SME 9.0 Alpha 2
This is the second ISO created from the SME 9 stream.
Goal
- Image must boot to runlevel 4 and services start.
- SME Server branding, no obvious upstream branding left in.
SME 9.0 Alpha X
As many Alphas as needed to make it usable.
SME 9.0 Beta 1
- Maturity is sufficient for widespread testing use
- contrib owners should start testing their own contrib packages
SME 9.0 Beta Y
At some point in the Beta cycle, as maturity improves and the rate of change slows, contribs should be tested.
SME 9.0 Beta X
As many Betas as needed to make it mature.
SME 9.0 RC 1
- Maturity matches SME 8.0
- Extensive testing need to prove maturity
SME 9.0 Final
- Maturity matches SME 8.0
- Feature parity with SME 8.0, the intention is not to add new features
- Content identical to the final RC, just version and release note updates.
- The main contrib packages should be working at the final release.