Changes

From SME Server
Jump to navigationJump to search
242 bytes added ,  08:36, 1 July 2007
m
no edit summary
Line 497: Line 497:     
'''Note:''' The last action of a job run is to remove the oldest backup, e.g. if archive scheduled.11 exists and you have set the scheduledKeep property to 12, then it must be deleted. This can take a significant long time, which increases the total job execution time.
 
'''Note:''' The last action of a job run is to remove the oldest backup, e.g. if archive scheduled.11 exists and you have set the scheduledKeep property to 12, then it must be deleted. This can take a significant long time, which increases the total job execution time.
 +
 +
 +
==== Bug report ====
 +
Affa is listed in the [http://bugs.contribs.org/enter_bug.cgi?product=SME%20Contribs&component=smeserver-affa bugtracker contribs section].
 +
Please report all bugs, new feature requests and documentation issues there.
 +
    
==== Changelog ====
 
==== Changelog ====
501

edits

Navigation menu