Changes

From SME Server
Jump to navigationJump to search
How to release ISOs and updates
Line 1: Line 1:  
{{WIP box}}
 
{{WIP box}}
 +
 +
== Releasing Packages==
    
The Koozali SME Server release procedure by the release manager (Terry Fage):
 
The Koozali SME Server release procedure by the release manager (Terry Fage):
   −
----
+
 
 +
=== ISOs ===
    
1. Receive a heads up from the devs on a new (Alpha/Beta/Final/Minor/Major) release.
 
1. Receive a heads up from the devs on a new (Alpha/Beta/Final/Minor/Major) release.
   −
2. He then would perp release notes and change logs based on information given from the devs
+
2. He then would prep release notes and change logs based on information given from the devs
    
3. He then would team up with documentation team and plan all required additions/changes to the wiki
 
3. He then would team up with documentation team and plan all required additions/changes to the wiki
Line 24: Line 27:     
10. He then would double check if all of the above has been finished before the mirrors are fully synced globally
 
10. He then would double check if all of the above has been finished before the mirrors are fully synced globally
 +
 +
 +
=== RPMs===
 +
 +
====Repos====
 +
 +
Where do packages go one they are added to buildsys?
 +
 +
Base packages
 +
smedev > smetest > smeupdates-testing > smeupdates
 +
 +
Contribs
 +
smedev > smetest > smecontribs

Navigation menu