Changes

Jump to navigation Jump to search
2 bytes added ,  03:09, 17 October 2007
m
Line 481: Line 481:  
|}
 
|}
   −
'''Note:''' The last action of a job run is to remove the oldest backup, e.g. if archive scheduled.11 exists and you have set the scheduledKeep property to 12, then it must be deleted. This can take a significant long time, which increases the total job execution time.
+
'''Note:''' The last action of a job run is to remove the oldest backup, e.g. if archive scheduled.11 exists and you have set the scheduledKeep property to 12, then it must be deleted. This can take a significantly long time, which increases the total job execution time.
    
==== Bug report ====
 
==== Bug report ====
95

edits

Navigation menu