Changes

Jump to navigation Jump to search
270 bytes added ,  21:40, 17 April 2007
m
Line 260: Line 260:  
|}
 
|}
    +
'''Note:''' The last action of a job run is to remove the oldest backup, e.g. if archive scheduled.11 exists and you have set the scheduledKeep property to 12, then it must be deleted. This can take a significant long time, which increases the total job execution time.
    
=== Changelog ===
 
=== Changelog ===
501

edits

Navigation menu