Changes

Jump to navigation Jump to search
162 bytes added ,  18:49, 6 December 2007
m
--rise performance
Line 540: Line 540:     
'''Note:''' The last action of a job run is to remove the oldest backup, e.g. if archive scheduled.11 exists and you have set the scheduledKeep property to 12, then it must be deleted. This can take a significantly long time, which increases the total job execution time.
 
'''Note:''' The last action of a job run is to remove the oldest backup, e.g. if archive scheduled.11 exists and you have set the scheduledKeep property to 12, then it must be deleted. This can take a significantly long time, which increases the total job execution time.
 +
 +
A affa --rise run on a SME 7.2, 40 GB data, 411.500 files, 2x2.8 Xeon CPU, 1GB RAM, SW-RAID 5 with 4 U320 SCSI drives took 7 minutes including the final reboot.
    
==== Bug report ====
 
==== Bug report ====
501

edits

Navigation menu