Changes

Jump to navigation Jump to search
Line 116: Line 116:     
===Preparation for a new ISO release===
 
===Preparation for a new ISO release===
 +
 +
====Generate a new Changelogs====
 +
When generating an ISO the Release Notes for the ISO should contain the full delta from the last ISO. Ian gets a script for doing that
 +
 +
====RPM dependencies Needed====
 +
The os, updates, and updates-testing repos are included so we can stage the packages we are going to release without actually having to release them. Normally the updates-testing repo is used for verification (testing is for developer testing). During the ISO release schedule (usually very short) we hold moving packages to updates-testing until I have the ISO built.
 +
 +
====RPM QA verification====
 +
During the ISO release schedule, ALL RPMS MUST BE VERIFIED IN SMEUPDATES-TESTING
    
====Server-Manager translations====
 
====Server-Manager translations====

Navigation menu